View Issue Details

IDProjectCategoryView StatusLast Update
0001949T99X171.00 SKB EagleGeneralpublic2025-04-07 10:11
Reporter(ALTech) SH Son Assigned To(MFG) Rachel Ruan Due Date
PrioritynormalSeveritys4-minorReproducibilityhave not tried
Status closedResolutionfixed 
Summary0001949: [EAGLE] 2024.05 Mass production inspection Report
Description[EAGLE] 2024.05 Mass production inspection Report
TagsNo tags attached.
Attach Tags

Relationships

related to 0001662 new [Eagle] Mass production inspection Report 

Activities

(ALTech) SH Son

2024-05-17 13:03

developer   ~0015840

HI An and Rachel

Here is inspection report of this month.
• Major
 Bottom cover bad weld line and bad gas mark
• Minor
 HDMI cable function NG * 1pcs
 T-Broad HDMI cable cosmetic issue * 100%

Please find the attachment file, and Please let me know if you need a defect sample for analysis

Thansk
SON

(MFG) Rachel Ruan

2024-05-17 17:17

developer   ~0015846

Dear SH Son

Thank you very much for reporting the problem with shipment lots 2024.05

1. We would like to explain the problem of HDMI having 100% visual cosmetic issue :
Because on Apr/2024, MFG has discovered a functional error in the HDMI cable, and has requested the supplier to sorting 100%, to prove the pass result, it must be remark white dot HDMI cable ( next time we will remark in another location).

2. One more, Pls help re-confirm the HDMI cable function NG – No signal on the TV => have white dot on the HDMI cable? because as we confirm all HDMI after sorting function pass will remark like that.
If possible, please send NG HDMI cable samples to us for further analysis by the vendor.

3. About housing issue, MFG and NWE vendor on checking defect issue and will provide root cause and corrective action on 8D report.

Many thanks
Rachel

(ALTech) SH Son

2024-05-20 14:21

developer   ~0015859

Hi Rachel,
Thank you for feedback as my report.
1. Agree that. Please remark another location.
2. there is no white dot. Please see the attachment photo
 - I will send this defect HDMI cable and let you know the shipping information.
3. Ok. Please update 8D report after vender checking.

Thanks
SON
image.png (1,186,668 bytes)
image-2.png (1,150,206 bytes)

(MFG) Rachel Ruan

2024-05-21 18:16

developer   ~0015866

Dear SH Son

About Bottom cover bad weld line and bad gas mark issue :

1. Bottom cover have bad weld line issue : The Root cause is material issue, NWE will improve in the next production batch, We will update the improved status for this issue.
2, Botom cover have bad gas mark issue . Because we couldn't see the problem clearly, when we actually checked it, we didn't find the same issue as reported by customers. Therefore, we want Defect housing return to Vietnam for further analysis.

Many thanks
Rachel

Issue History

Date Modified Username Field Change
2024-05-17 12:52 (ALTech) SH Son New Issue
2024-05-17 12:52 (ALTech) SH Son Relationship added related to 0001662
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (ALTech) Hyunsik Kim
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (ALTech) Sun Choul Joung
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (MFG) An Tran
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (MFG) Ben Trinh
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (MFG) Rachel Ruan
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (MFG) Toney Tu
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (PM) Dennis Lu
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (PM) Sheila Tu
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2024-05-17 12:52 (ALTech) SH Son Issue Monitored: (Sales) Miya Wang
2024-05-17 13:01 (ALTech) SH Son Assigned To => (PM) Roisy Liang
2024-05-17 13:01 (ALTech) SH Son Status new => assigned
2024-05-17 13:01 (ALTech) SH Son Assigned To (PM) Roisy Liang => (MFG) Rachel Ruan
2024-05-17 13:03 (ALTech) SH Son Note Added: 0015840
2024-05-17 13:03 (ALTech) SH Son File Added: [EAGLE] 2024.05_Mass production inspection_rev01.pdf
2024-05-17 13:39 (SW) Kerwin Chen Severity s2-severe => s4-minor
2024-05-17 17:17 (MFG) Rachel Ruan Note Added: 0015846
2024-05-17 17:17 (MFG) Rachel Ruan File Added: FIT PN 371.01057.005 HDMI Sorting update.xlsx
2024-05-20 14:21 (ALTech) SH Son Note Added: 0015859
2024-05-20 14:21 (ALTech) SH Son File Added: image.png
2024-05-20 14:21 (ALTech) SH Son File Added: image-2.png
2024-05-21 18:16 (MFG) Rachel Ruan Note Added: 0015866
2024-05-21 18:16 (MFG) Rachel Ruan File Added: BFX-AT100 Bottom cover bad weld line and bad gas mark FA Report .pptx
2024-09-04 14:54 (ALTech) SH Son Issue End Monitor: (MFG) Ben Trinh
2024-09-04 14:54 (ALTech) SH Son Issue End Monitor: (PM) Dennis Lu
2025-04-07 10:11 (PM) Sheila Tu Status assigned => closed
2025-04-07 10:11 (PM) Sheila Tu Resolution open => fixed